Casegoods include furniture such as cabinets, wardrobes, desks and storage units. Much of their quality is hidden behind the visible finish. A useful specification therefore looks beyond the front elevation to the cabinet structure, drawers, fittings and the way each piece will reach and function in its final location.

Discuss your project
Curved dark storage cabinet with textured doors and a light wood-tone top.
Showroom reference · AgentFoshan
01

Define the internal construction

Request the proposed panel materials, thicknesses, backing, edges and connection details for each relevant component. Identify exposed interiors and concealed surfaces so their finish is intentional. Discuss how shelves are supported and what the storage is expected to hold; the manufacturer should address the required design rather than rely on a generic cabinet drawing. Review the relationship between the carcass and any stone, glass or metal components.

02

Make storage practical to use

Check usable internal dimensions, not only the external outline. Doors and drawers need enough space to open in the actual room arrangement. Handles should be reachable and positioned consistently, while adjustable parts should remain serviceable after installation. For an illustrative office cabinet, the intended files or equipment may determine shelf spacing. Confirm such requirements early instead of discovering that an attractive cabinet cannot accommodate its intended contents.

03

Coordinate built-in and freestanding details

Identify which items are loose furniture and which need site attachment, fillers or connections to adjacent work. Review uneven-wall allowances, skirting interfaces and access to services where relevant. Any anchoring or stability requirements need assessment by the responsible qualified project parties. Avoid treating a furniture quotation as automatically including wall preparation, electrical work or installation. Record who supplies and installs every interface component before approving the final package.

04

Plan assembly and long-term access

Ask whether the unit ships assembled, partly assembled or flat-packed and assess the implications for labour, protection and delivery access. Agree how parts will be labelled and what assembly information accompanies them. Check whether hardware and service panels can be reached after installation. A cabinet that cannot be maintained without dismantling surrounding furniture can create avoidable operating problems. Keep the approved construction and hardware references with the handover documents.

Project checklist

Before you release the order

  • Define panels, edges, backs and interior finishes.
  • Verify usable storage and opening clearances.
  • Allocate anchoring, fillers and installation work.
  • Agree shipping format, labelling and service access.

A useful question

Should custom cabinets be shipped assembled or flat-packed?

There is no universal answer. Compare the item’s construction, transport volume, risk of damage, site access and available installation skills. Ask for the complete cost and responsibility of each option rather than choosing on freight volume alone.

Ready to define your project?

Share your scope, quantities, destination and target date. We will review whether it fits our current capacity.